Reference · Provenance & scope

Deck code basis: the source, the load model, and where it stops

Every deck span, member size, fastener spacing and footing dimension published on this site comes from one document: the American Wood Council’s DCA 6 — Prescriptive Residential Wood Deck Construction Guide, DCA6-2015 edition, based on the 2015 International Residential Code, © 2018 AWC. This page names the file we read, how we read it, what its tables assume — and every place those tables stop.

It exists because the useful question about a deck calculator is not “what number did it give you.” It is “where did that number come from, and what will it do at the edge.”

The source of record

AWC DCA 6-2015, © 2018 American Wood Council, published free by AWC. Here is the exact file, so you can pull the same one and check any cell we print.

Bibliographic and file details of the source document used for every structural value on this site.
DocumentDCA 6 — Prescriptive Residential Wood Deck Construction Guide
PublisherAmerican Wood Council (AWC)
EditionDCA6-2015, based on the 2015 International Residential Code
Copyright© 2018 American Wood Council
FileAWC-DCA62015-DeckGuide-1804.pdf
Length44 pages, 3,485,234 bytes
MD5 checksum764d2d9835cb353878048f101ffd95fa
PDF created / modified2018-04-17 / 2019-01-21
Retrieved2026-06-29, from AWC’s own media host
Methodcurl download, then pdftotext -layout (Poppler) extraction
The guide’s public landing page is awc.org/codes-standards/publications/dca6 and the PDF is free. Verify the checksum against your own download before trusting anyone’s transcription, including ours.

The tables are shipped in our engine as static, transcribed data reviewed against that PDF. The engine does not compute spans from stress equations and then present the result as code — where the guide gives a value, we use the value; where it does not, we say so.

Why the 2015 edition, and not something newer-sounding

Because 2015 is the edition that carries the reduced Southern Pine design values. In 2013 the Southern Pine Inspection Bureau lowered the published design values for Southern Pine, and span tables printed before that change give longer spans for the same joist.

The tell is one cell. In DCA6-2015, a Southern Pine 2x10 at 16" on center spans 14'-0" — the post-2013 number, and the one our engine returns. The 2012 edition predates the reduction and publishes a longer span for that same joist. We deliberately did not source from it. If you are checking any deck span table against ours, that cell will tell you within seconds which side of 2013 it came from. DCA6-2015 Table 2, p.4

The IRC itself is published on a three-year cycle — 2015, 2018, 2021, 2024 — and jurisdictions adopt on their own schedule, with local amendments, so the newest edition in print is frequently not the one in force where you are building. A tool that names its edition, table and page can be checked against the printed page. A tool that advertises compliance with an edition, but never names a table or a page, cannot be checked at all — and an edition year that is not on the cycle above is a claim about a document that does not exist.

What the tables assume

Every DCA6-2015 table we use is published at 50 psf total — 40 psf live load plus 10 psf dead load — for No. 2 grade lumber in wet service conditions, at L/360 deflection. Change any one of those and the table no longer applies.

  • Design load: 40 psf live + 10 psf dead = 50 psf. Snow drift, concentrated loads, hot tubs, planters, outdoor kitchens and roofs are not in this model.

    DCA6-2015 Table 2 fn.1 / Table 3A fn.1 / Table 4 fn.1 / Table 5 header

  • Grade and service: No. 2 grade, wet service conditions. The published values already account for exterior exposure — do not derate them again.

    DCA6-2015 Table 2 fn.1, p.4

  • Deflection: L/360 for joists and simple-span beams; cantilever length/180 with a 220 lb point load for overhangs.

    DCA6-2015 Table 2 fn.2–3 / Table 3A fn.1

  • Incising is assumed for Douglas Fir-Larch, Hem-Fir and Spruce-Pine-Fir. The tabulated spans already embody it.

    DCA6-2015 Table 2 fn.4, p.4

  • Footings: 1,500 psf assumed soil bearing capacity, 150 pcf concrete, 2,500 psi compressive strength. Corner post values may be multiplied by 0.9. Soil that bears less than the assumption needs a bigger footing than the table gives.

    DCA6-2015 Table 4 fn.2 + fn.4, p.12

  • Posts: the prescriptive minimum deck post is 6x6 nominal, not 4x4. An 8x8 may substitute anywhere to a maximum height of 14 feet.

    DCA6-2015 p.10 + Table 4 fn.5, p.12

How species are grouped

Southern Pine reads its own column. Douglas Fir-Larch, Hem-Fir and Spruce-Pine-Fir share a single column in Tables 2, 3A and 4 — so a Douglas Fir-Larch design and a Hem-Fir design return the same span from us.

That is the guide’s own grouping, not a shortcut of ours, and the shared column is the governing minimum of the group — which makes it the conservative read for any of the three. Any species or grade outside Southern Pine, Douglas Fir-Larch, Hem-Fir and Spruce-Pine-Fir at No. 2 grade is outside these tables entirely.

Which table stands behind which number

Eight places in one 44-page document produce every structural number on this site.

Mapping from each DCA6-2015 table or page to the class of structural value it provides.
SourcePageWhat it provides
Table 2p.4Maximum joist spans and overhangs, by species, size and spacing
Table 3Ap.6Dimension-lumber beam spans, supporting a single span of joists
Table 4p.126x6 post heights and footing sizes, by beam span × joist span
Table 5p.15Ledger / band / rim joist fastener spacing
Table 6p.21Minimum stair tread size for cut and solid stringers
Body textp.3Decking angle envelope: perpendicular to 45°, each board bearing on at least 3 supports
Body textp.15, p.17Prohibited ledger attachments, and the lateral-load hold-down requirement
Body textp.20Stair width, landings, handrails, stringers and guard-post requirements
All references: AWC DCA 6-2015, © 2018 AWC

One caution worth carrying: DCA6-2015 renumbered its tables relative to older editions. Table 1 here is the species list, not the joist spans. If a source cites “DCA 6 Table 1” for a joist span, it is quoting an older edition.

Where prescriptive design ends

These are the boundaries our engine detects and refuses to guess past. Each one is a place the guide simply stops publishing values, so past it we stop publishing one too — and we name the footnote that ended the road rather than extending it.

Boundaries of the DCA6-2015 prescriptive method, the engine flag code emitted at each, and the source page.
FlagThe boundarySource
DCA6-2015-T2-fn7Joist span longer than 18'-0". The prescriptive method stops there for footing design; there is no longer row to read.Table 2 fn.7, p.4
DCA6-2015-T2Required span longer than the cell for that size, species and spacing. The engine names the next size up — or, past 2x12, says the span is off the tables entirely.Table 2, p.4
DCA6-2015-T2-fn6A 2x6 used as a ledger, or as a joist or rim a guard post attaches to. Not permitted; the minimum is 2x8 nominal.Table 2 fn.6, p.4
DCA6-2015-T2-fn3Overhang beyond the lesser of the table overhang LO or one quarter of the joist span. Both caps apply; the smaller one governs.Table 2 fn.3 + body text, p.3–4
DCA6-2015-T3ACarried joist span past 18 feet — the largest tributary column Table 3A publishes — or a beam member the table does not cover for that species.Table 3A, p.6
DCA6-2015-T3A-multispanAny interior beam line. Table 3A is titled “Supporting a Single Span of Joists”, so a deck on multiple support lines is outside its scope. The guide publishes no continuous-beam values, so neither do we.Table 3A title + scope, p.6
DCA6-2015-T4A 6x6 post taller than the Table 4 maximum for the tributary it carries. An 8x8 substitutes anywhere to 14 feet; past that it is a designed column.Table 4 + fn.5, p.10–12
DCA6-2015-prohibited-ledgerA ledger on brick or stone veneer, hollow masonry, or a cantilevered floor overhang. Prohibited outright — the guide’s words are “DO NOT ATTACH TO BRICK VENEERS”.p.15, p.17
IRC-R403.1.4Footing depth. DCA 6 sizes the footing but cannot tell you how deep to dig — frost depth is set by your jurisdiction, always.IRC R403.1.4
Codes shown are the identifiers our engine emits on a design, so a flag you see in the app can be traced to the line in the guide that produced it. One boundary in the guide is deliberately not listed above: Table 4 marks 4 post-and-footing cells Not Permitted outright, but all 4 sit in the Spruce-Pine-Fir / Ponderosa sub-column, and the three species we size read the Southern Pine and Douglas Fir-Larch / Hem-Fir columns — so that is a limit of the table, not a refusal we can perform. The full table, that column included, is on the beam and footing calculator.

When does a deck need an engineer?

A deck needs a licensed design professional whenever it falls outside the prescriptive tables — and the tables are narrower than most people expect.

  • A joist span longer than 18'-0", or a span the table cannot cover even at 2x12.
  • Any deck with an interior beam line. Table 3A covers a single span of joists; a multi-support deck is off it.
  • A post and footing combination the guide marks Not Permitted, or a post taller than its tabulated maximum.
  • A ledger on brick or stone veneer, hollow masonry, or a cantilevered floor overhang.
  • Any load the tables do not assume: a hot tub, a planter wall, an outdoor kitchen, a roof structure, or drifting snow.
  • Species or grade outside Southern Pine, Douglas Fir-Larch, Hem-Fir or Spruce-Pine-Fir at No. 2 grade.
  • Soil that bears less than the assumed 1,500 psf, or any footing condition your soil report contradicts.
  • Anything your building official asks to see stamped — which they may, even on a deck that passes every table.

Passing every table is not the same as being approved. The prescriptive method is a safe-harbour path within one code edition at one load basis; the code your jurisdiction has adopted, its local amendments, and the official reviewing your permit set are what actually govern.

Common questions

When does a deck need an engineer?
A deck needs a licensed design professional whenever it falls outside the prescriptive tables. In practice that means: a joist span over 18'-0"; a required span longer than the table allows even at 2x12; any deck with an interior beam line, because AWC DCA 6-2015 Table 3A only covers a single span of joists; a post-and-footing combination the guide marks Not Permitted; a ledger on brick or stone veneer, hollow masonry, or a cantilevered floor overhang; and any load the tables do not assume — a hot tub, a planter, an outdoor kitchen, a roof, or drifting snow. Your Authority Having Jurisdiction can also require a stamped design for a deck that passes every table.
What are deck span tables based on?
The deck span tables in common use come from AWC DCA 6, the American Wood Council's Prescriptive Residential Wood Deck Construction Guide, which is written against a specific edition of the International Residential Code. We publish from DCA6-2015, based on the 2015 IRC, © 2018 AWC. Its tables assume 40 psf live load and 10 psf dead load, No. 2 grade lumber, wet service conditions, and L/360 deflection.
What load do deck span tables assume?
40 psf live load plus 10 psf dead load — 50 psf total — is the stated load basis of every DCA6-2015 table we use (Table 2 fn.1, Table 3A fn.1, Table 4 fn.1, and the Table 5 header). Snow drift, concentrated loads, hot tubs, planters, and roofs are not in that model. A deck carrying any of them is outside the prescriptive tables.
Which edition of DCA 6 should I use?
Use an edition published after 2013, because the Southern Pine design values were reduced by the Southern Pine Inspection Bureau in 2013 and older tables publish longer spans for the same joist. DCA6-2015 carries the reduced values: Southern Pine 2x10 at 16" on center spans 14'-0". We deliberately did not source from the 2012 edition, which predates the reduction. Whichever edition you use, your jurisdiction adopts a specific code edition and its amendments — that adoption governs, not the guide.
Is a deck designed from span tables code compliant?
Meeting a prescriptive table is a screen, not a certification. The tables are a safe-harbour path within one code edition, at one load basis, for one grade and service condition. Compliance is determined by the code your jurisdiction has adopted, its local amendments, and the building official who reviews the permit set. Our tools screen a design against the DCA6-2015 / IRC prescriptive baseline and tell you where it falls outside; they do not produce stamped engineering.
Why cite an older code edition instead of the newest one?
Because the edition is the fact, and a specific dated source is more useful than a vague newer-sounding one. The IRC is published on a three-year cycle — 2015, 2018, 2021, 2024 — and jurisdictions adopt on their own schedule, so the newest edition is very often not the one in force where you are building. Naming the edition, the table, and the page lets you check our number against the printed page. A compliance claim that names no edition, table, or page cannot be checked at all.

See it run on a real deck

The free 3D deck designer applies every table on this page as you draw — sizing joists, beams, posts and footings, and telling you the moment your deck steps outside them. No signup.